top of page
Writer's pictureVannesa Vasquez

Lab Renovation Job Completed!


The scope of work consists of the demolition of conference rooms, break room, and lobby. The tenant improvement includes new biochem labs & support area on the first floor of a 2-story building. Included new routing of electrical conduit from electrical room to new lab space, including installing new panelboards that involved supporting existing lab chambers containing critical samples/products while performing standby power shutdown. Included new routing of HVAC to newly converted lab space throughout the building. New labs received new casework, fume hoods, fridges & freezers, VCT flooring, epoxy paint, process gas utilities, DI water, and aluminum wire mold throughout. Extension of the existing corridor to the exterior included new LVT flooring, paint refresh, and a new storefront entrance.




35 views0 comments

Comments


bottom of page