In an effort to contribute to the overall satisfaction of corporate staff, Adaptec elected to expand office space and introduce a new fitness facility. This expansion was created from existing warehouse space in Adaptec’s Building 6. Construction included all new rooftop HVAC equipment to support the increased heat
load generated by an athletic space as well as a new electrical service. Architecturally, the project included full ceramic restrooms, built in banquette seating, all new office furniture, vaulted corridor ceilings with skylights, tiered soffits, shock absorbent aerobic floors and full length mirrors.