This area was built so that all the piping and power is 12’ A.F.F. This is to allow tools to be moved in and out. All the vacuum pumping is run up, over and down to the bottom of the tools
The gas piping mains are run high along the back wall of the gray area, dropped down to the valve boxes, then up and over the aisle to the tool.